100% Original Factory Water Heater Pipe Fittings - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our enterprise since its inception, often regards solution excellent as enterprise life, continually strengthen output technology, enhance product high quality and continually strengthen organization total high-quality administration, in strict accordance using the national standard ISO 9001:2000 for Black Malleable Iron Fittings , Wall Mount Pipe Clamp , Socket , Any needs from you'll be paid out with our best notice!
100% Original Factory Water Heater Pipe Fittings - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

100% Original Factory Water Heater Pipe Fittings -
 Fast Coupling – Donghuan detail pictures

100% Original Factory Water Heater Pipe Fittings -
 Fast Coupling – Donghuan detail pictures

100% Original Factory Water Heater Pipe Fittings -
 Fast Coupling – Donghuan detail pictures

100% Original Factory Water Heater Pipe Fittings -
 Fast Coupling – Donghuan detail pictures

100% Original Factory Water Heater Pipe Fittings -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We're commitment to offer you the aggressive cost ,superb products and solutions top quality, too as fast delivery for 100% Original Factory Water Heater Pipe Fittings - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Karachi , Riyadh , Belgium , Our well-equipped facilities and excellent quality control throughout all stages of production enable us to guarantee total customer satisfaction. If you are interested in any of our products or would like to discuss a custom order, please feel free to contact me. We are looking forward to forming successful business relationship with new clients around the world.
  • This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
    5 Stars By Janet from Malta - 2017.12.31 14:53
    Superb technology, perfect after-sales service and efficient work efficiency, we think this is our best choice.
    5 Stars By Mona from Stuttgart - 2018.12.25 12:43
    Write your message here and send it to us