100% Original Pipe Tee Clamp - Meter Suivel Offsets – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We'll make each hard work to become excellent and excellent, and speed up our measures for standing from the rank of intercontinental top-grade and high-tech enterprises for Drain Pipe Clamp , Fences Pipe Fittings , Bsp Pipe Fittings , We welcome new and previous clients from all walks of lifestyle to get in touch with us for long term business relationships and mutual accomplishment!
100% Original Pipe Tee Clamp - Meter Suivel Offsets – Donghuan Detail:

Details

Gas meter connection is used to transport natural and propane gas in residential applications, gas meter connectors including GALVANIZED METER UNION, gas meter swivels, swivel nuts, insulated unions ,BSCA20, Offset insulated etc. We understand the critical nature of meter connections and we recognize the need for safe and reliable connections that can be used in a variety of meter connection application. We also can produced according to customer’s requirement, if you have your special requirement, welcome contact with us. Sample or drawing both are ok for us to open the new mould for you.



1.Material: Malleable iron

2.Size Available: 3/4’’—2’’

3.Surface :  Hot dip galvanized

Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.

The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01

4.Application  Suitable for fire piping system,air,gas,oil and so on.

5.Treatment: By CNC machine.

6.Methods to avoid the problem:

① Pay attention to the placement during annealing

② Casting surface: no trachoma, pores and other phenomena

③ Galvanized surface needs to be bright, no leaked and black oil stain

④ Thread requirement: Thread meets the requirement of ring gauge or plug gauge, strengthen the inspection of the machining part and adopt numerical control machining.

⑤ 100% Pressure

⑥ Packing requirements : keep the carton clean and tidy, label paste correctly

7. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

8. Packing detail: Packed in cartons then on pallets;

9. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

10. Quantity tolerance: 15% .


Product detail pictures:

100% Original Pipe Tee Clamp -
 Meter Suivel Offsets – Donghuan detail pictures

100% Original Pipe Tee Clamp -
 Meter Suivel Offsets – Donghuan detail pictures

100% Original Pipe Tee Clamp -
 Meter Suivel Offsets – Donghuan detail pictures

100% Original Pipe Tee Clamp -
 Meter Suivel Offsets – Donghuan detail pictures


Related Product Guide:

Fast and fantastic quotations, informed advisers to help you choose the correct products that suits all your needs, a short manufacturing time, responsible good quality control and distinct companies for paying and shipping affairs for 100% Original Pipe Tee Clamp - Meter Suivel Offsets – Donghuan , The product will supply to all over the world, such as: Switzerland , Luxembourg , Costa Rica , During in 11 years, We've participated in more than 20 exhibitions, obtains the highest praise from each customer. Our company has been devoting that "customer first" and committed to helping customers expand their business, so that they become the Big Boss !
  • High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
    5 Stars By Grace from Frankfurt - 2018.12.22 12:52
    The sales manager has a good English level and skilled professional knowledge, we have a good communication. He is a warm and cheerful man, we have a pleasant cooperation and we became very good friends in private.
    5 Stars By Alan from Anguilla - 2017.09.26 12:12
    Write your message here and send it to us