2021 China New Design Tube Holding Clamps - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We hold strengthening and perfecting our items and repair. At the same time, we get the job done actively to do research and progress for Air Hose Connectors Fittings , Cast Iron Flanged Fittings , Cast Iron Plumbing Fittings , Your inquiry will be highly welcomed and a win-win prosperous development are what we are expecting.
2021 China New Design Tube Holding Clamps - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures

2021 China New Design Tube Holding Clamps -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We always do the job to be a tangible group making sure that we can provide you with the top top quality as well as ideal value for 2021 China New Design Tube Holding Clamps - Fast Coupling – Donghuan , The product will supply to all over the world, such as: azerbaijan , Barcelona , Houston , For more than ten years experience in this filed, our company has gained high reputation from home and abroad. So we welcome friends from all over the world to come and contact us, not only for business, but also for friendship.
  • Product variety is complete, good quality and inexpensive, the delivery is fast and transport is security, very good, we are happy to cooperate with a reputable company!
    5 Stars By Queena from Netherlands - 2018.11.02 11:11
    The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
    5 Stars By Melissa from South Africa - 2017.11.12 12:31
    Write your message here and send it to us