China Factory for T Pipe Fitting - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

High quality Very first,and Shopper Supreme is our guideline to offer the most beneficial company to our clients.Nowadays, we're hoping our best to be certainly one of the top exporters in our area to satisfy consumers additional will need for Double Pipe Clamp , Malleable Fittings , Black Pipe And Fittings , Our tenet is "Reasonable prices, economical production time and very best service" We hope to cooperate with much more shoppers for mutual enhancement and benefits.
China Factory for T Pipe Fitting - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

China Factory for T Pipe Fitting -
 Fast Coupling – Donghuan detail pictures

China Factory for T Pipe Fitting -
 Fast Coupling – Donghuan detail pictures

China Factory for T Pipe Fitting -
 Fast Coupling – Donghuan detail pictures

China Factory for T Pipe Fitting -
 Fast Coupling – Donghuan detail pictures

China Factory for T Pipe Fitting -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

Sticking for the principle of "Super Quality, Satisfactory service" ,We have been striving for being a superb small business partner of you for China Factory for T Pipe Fitting - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Algeria , Orlando , Malaysia , Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs. We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
  • Superb technology, perfect after-sales service and efficient work efficiency, we think this is our best choice.
    5 Stars By Andy from Qatar - 2017.02.18 15:54
    The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Eleanore from Florida - 2018.12.05 13:53
    Write your message here and send it to us