China Gold Supplier for Fitting Clamp For Pipe - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Being supported by an advanced and professional IT team, we could offer technical support on pre-sales & after-sales service for Water Heater Pipe Fittings , Malleable Iron Pipe Fittings Uk , Connector Air Hose , Should you be fascinated in any of our products and services, remember to do not hesitate to make contact with us. We're ready to reply you inside of 24 several hours soon after receipt of one's ask for and also to develop mutual un-limited advantages and organization in around potential.
China Gold Supplier for Fitting Clamp For Pipe - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

China Gold Supplier for Fitting Clamp For Pipe -
 Fast Coupling – Donghuan detail pictures

China Gold Supplier for Fitting Clamp For Pipe -
 Fast Coupling – Donghuan detail pictures

China Gold Supplier for Fitting Clamp For Pipe -
 Fast Coupling – Donghuan detail pictures

China Gold Supplier for Fitting Clamp For Pipe -
 Fast Coupling – Donghuan detail pictures

China Gold Supplier for Fitting Clamp For Pipe -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We're committed to furnishing easy,time-saving and money-saving one-stop purchasing support of consumer for China Gold Supplier for Fitting Clamp For Pipe - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Southampton , Georgia , Juventus , With more than 9 years of experience and a professional team, we have exported our products to many countries and regions all over the world. We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.
  • The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Renee from Saudi Arabia - 2018.05.22 12:13
    This company has the idea of "better quality, lower processing costs, prices are more reasonable", so they have competitive product quality and price, that's the main reason we chose to cooperate.
    5 Stars By Natividad from Cambodia - 2017.02.14 13:19
    Write your message here and send it to us