China Supplier Pipe Clamp Coupling - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

The shopper satisfaction is our primary focus on. We uphold a consistent level of professionalism, quality, credibility and repair for Pipe Flange Clamp , Tube Connector Clamps , Ss Pipe Clamp , If you are looking for Good Quality at a good price and timely delivery. Do contact us.
China Supplier Pipe Clamp Coupling - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

China Supplier Pipe Clamp Coupling -
 Fast Coupling – Donghuan detail pictures

China Supplier Pipe Clamp Coupling -
 Fast Coupling – Donghuan detail pictures

China Supplier Pipe Clamp Coupling -
 Fast Coupling – Donghuan detail pictures

China Supplier Pipe Clamp Coupling -
 Fast Coupling – Donghuan detail pictures

China Supplier Pipe Clamp Coupling -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

we can easily offer you high-quality products and solutions, competitive rate and very best shopper support. Our destination is "You come here with difficulty and we give you a smile to take away" for China Supplier Pipe Clamp Coupling - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Netherlands , Rotterdam , Netherlands , As an experienced manufacturer we also accept customized order and we could make it the same as your picture or sample specification. The main goal of our company is to live a satisfactory memory to all the customers, and establish a long term business relationship with buyers and users all over the world.
  • High Quality, High Efficiency, Creative and Integrity, worth having long-term cooperation! Looking forward to the future cooperation!
    5 Stars By Mamie from Philippines - 2018.03.03 13:09
    The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Anna from Malawi - 2018.10.09 19:07
    Write your message here and send it to us