China Supplier Water Pipe Saddle Clamp - Meter Suivel Offsets – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Bear "Customer initially, High quality first" in mind, we do the job closely with our customers and supply them with efficient and skilled providers for Plastic Pipe Clamps , Right Angle Pipe Clamp , Stainless Steel Camlock Fittings , In order to expand our international market, we mainly supply our oversea customers Top quality performance products and service.
China Supplier Water Pipe Saddle Clamp - Meter Suivel Offsets – Donghuan Detail:

Details

Gas meter connection is used to transport natural and propane gas in residential applications, gas meter connectors including GALVANIZED METER UNION, gas meter swivels, swivel nuts, insulated unions ,BSCA20, Offset insulated etc. We understand the critical nature of meter connections and we recognize the need for safe and reliable connections that can be used in a variety of meter connection application. We also can produced according to customer’s requirement, if you have your special requirement, welcome contact with us. Sample or drawing both are ok for us to open the new mould for you.



1.Material: Malleable iron

2.Size Available: 3/4’’—2’’

3.Surface :  Hot dip galvanized

Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.

The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01

4.Application  Suitable for fire piping system,air,gas,oil and so on.

5.Treatment: By CNC machine.

6.Methods to avoid the problem:

① Pay attention to the placement during annealing

② Casting surface: no trachoma, pores and other phenomena

③ Galvanized surface needs to be bright, no leaked and black oil stain

④ Thread requirement: Thread meets the requirement of ring gauge or plug gauge, strengthen the inspection of the machining part and adopt numerical control machining.

⑤ 100% Pressure

⑥ Packing requirements : keep the carton clean and tidy, label paste correctly

7. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

8. Packing detail: Packed in cartons then on pallets;

9. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

10. Quantity tolerance: 15% .


Product detail pictures:

China Supplier Water Pipe Saddle Clamp -
 Meter Suivel Offsets – Donghuan detail pictures

China Supplier Water Pipe Saddle Clamp -
 Meter Suivel Offsets – Donghuan detail pictures

China Supplier Water Pipe Saddle Clamp -
 Meter Suivel Offsets – Donghuan detail pictures

China Supplier Water Pipe Saddle Clamp -
 Meter Suivel Offsets – Donghuan detail pictures


Related Product Guide:

Often customer-oriented, and it's our ultimate target to become not only probably the most reputable, trustable and honest provider, but also the partner for our customers for China Supplier Water Pipe Saddle Clamp - Meter Suivel Offsets – Donghuan , The product will supply to all over the world, such as: Jeddah , Ghana , UK , We follow superior mechanism to process these products that ensure optimum durability and reliability of the products. We follow latest effective washing and straightening processes that allow us to offer unmatched quality of products for our clients. We continually strive for perfection and all our efforts are directed towards attaining complete client satisfaction.
  • Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Julia from Czech - 2017.12.19 11:10
    The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
    5 Stars By Arthur from Casablanca - 2018.12.11 11:26
    Write your message here and send it to us