Factory made hot-sale Pipe To Pipe Clamp - Sockets – Donghuan
Factory made hot-sale Pipe To Pipe Clamp - Sockets – Donghuan Detail:
Details
1.Carbon steel hose menders have precise sized, better mechanical behavior and tightness, and used widely in construction energy, processing, and fabrication industries.
2. We provide a comprehensive range of Carbon Steel Nipple. And it is been manufactured by technical team using high grade carbon steel & technologically advance machinery.


3.Hose Menders specification:

| A | B | C&D | E | F | G | H | |
|
1/2*1-1/4 |
24 |
18 |
NPT 1/2″ |
23 |
28 |
16 |
26.5 |
|
1/2*1-1/2 |
24 |
18 |
NPT 1/2″ |
23 |
28 |
16 |
26.5 |
|
1/2*2 |
24 |
18 |
NPT 1/2″ |
23 |
28 |
16 |
26.5 |
|
3/4*1-1/4 |
27 |
23 |
NPT 3/4″ |
27 |
32 |
20 |
29 |
|
3/4*1-1/2 |
27 |
23 |
NPT 3/4″ |
27 |
32 |
20 |
29 |
|
3/4*2 |
27 |
23 |
NPT 3/4″ |
27 |
32 |
20 |
29 |
|
1*1-1/2 |
35 |
29 |
NPT 1″ |
34.5 |
39 |
23 |
32 |
|
1*2 |
35 |
29 |
NPT 1″ |
34.5 |
39 |
23 |
32 |
|
1*2-1/2 |
35 |
29 |
NPT 1″ |
34.5 |
39 |
23 |
32 |
|
1*3 |
35 |
29 |
NPT 1″ |
34.5 |
39 |
23 |
32 |
|
1*4 |
35 |
29 |
NPT 1″ |
34.5 |
39 |
23 |
32 |
|
1-1/4*2 |
43.5 |
37.5 |
NPT 1-1/4″ |
43 |
48 |
25 |
35 |
|
1-1/4*2-1/2 |
43.5 |
37.5 |
NPT 1-1/4″ |
43 |
48 |
25 |
35 |
|
1-1/4*3 |
43.5 |
37.5 |
NPT 1-1/4″ |
43 |
48 |
25 |
35 |
|
1-1/4*4 |
43.5 |
37.5 |
NPT 1-1/4″ |
43 |
48 |
25 |
35 |
|
1-1/4*6-8 |
43.5 |
37.5 |
NPT 1-1/4″ |
43 |
48 |
25 |
35 |
|
1-1/2*2-1/2 |
50 |
43.5 |
NPT 1-1/2″ |
49 |
55 |
26 |
41.5 |
|
1-1/2*3 |
50 |
43.5 |
NPT 1-1/2″ |
49 |
55 |
26 |
41.5 |
|
1-1/2*4 |
50 |
43.5 |
NPT 1-1/2″ |
49 |
55 |
26 |
41.5 |
|
1-1/2*5-6 |
50 |
43.5 |
NPT 1-1/2″ |
49 |
55 |
26 |
41.5 |
|
2*2-1/2 |
63 |
55.5 |
NPT 2″ |
61 |
67 |
27 |
45 |
|
2*3 |
63 |
55.5 |
NPT 2″ |
61 |
67 |
27 |
45 |
|
2*4 |
63 |
55.5 |
NPT 2″ |
61 |
67 |
27 |
45 |
|
2*6 |
63 |
55.5 |
NPT 2″ |
61 |
67 |
27 |
45 |
|
2-1/2*3 |
74 |
66.5 |
NPT 2-1/2″ |
76 |
80.5 |
28 |
45 |
|
2-1/2*4 |
74 |
66.5 |
NPT 2-1/2″ |
76 |
80.5 |
28 |
45 |
|
2-1/2*6 |
74 |
66.5 |
NPT 2-1/2″ |
76 |
80.5 |
28 |
45 |
5. Surface: Zinc-plated, unplated4. Material: Carbon steel;
Note: zinc-plated steel for better corrosion resistance than unplated steel, prevent rust and weathering.
6. The working pressure varies with the construction of the hose, and the application shall not exceed the working pressure of the lowest rated component in the hose system.
7. We can produce according to your requirement size and drawings.
8. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;
9. Packing detail: Packed in cartons then on pallets;
10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;
11. Quantity tolerance: 15% .
Product detail pictures:
Related Product Guide:
Our company since its inception, always regards product quality as enterprise life, continuously improve production technology, improve product quality and continuously strengthen enterprise total quality management, in strict accordance with the national standard ISO 9001:2000 for Factory made hot-sale Pipe To Pipe Clamp - Sockets – Donghuan , The product will supply to all over the world, such as: El Salvador , Venezuela , Canada , We firmly think that we have the full capability to give you contented merchandise. Wish to collect concerns within you and build a new long-term synergy romantic relationship. We all significantly promise:Csame excellent, better selling price; exact selling price, better quality.
The goods we received and the sample sales staff display to us have the same quality, it is really a creditable manufacturer.


