factory Outlets for Malleable Iron Fittings - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We hold strengthening and perfecting our items and repair. At the same time, we get the job done actively to do research and progress for Aluminium Camlock Coupling , Pipe Clamp Bracket , Tube Clamps Near Me , We are keeping durable small business relationships with additional than 200 wholesalers in the USA, the UK, Germany and Canada. For anyone who is intrigued in any of our products, make sure you experience free to speak to us.
factory Outlets for Malleable Iron Fittings - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

factory Outlets for Malleable Iron Fittings -
 Fast Coupling – Donghuan detail pictures

factory Outlets for Malleable Iron Fittings -
 Fast Coupling – Donghuan detail pictures

factory Outlets for Malleable Iron Fittings -
 Fast Coupling – Donghuan detail pictures

factory Outlets for Malleable Iron Fittings -
 Fast Coupling – Donghuan detail pictures

factory Outlets for Malleable Iron Fittings -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

we could supply good quality goods, aggressive cost and very best purchaser assistance. Our destination is "You come here with difficulty and we supply you with a smile to take away" for factory Outlets for Malleable Iron Fittings - Fast Coupling – Donghuan , The product will supply to all over the world, such as: azerbaijan , Sierra Leone , Bogota , We are increasingly expanding our international market share based on quality products, excellent service, reasonable price and timely delivery. Please contact us at any time for more information.
  • The company leader recept us warmly, through a meticulous and thorough discussion, we signed a purchase order. Hope to cooperate smoothly
    5 Stars By Hulda from Afghanistan - 2018.02.08 16:45
    The accounts manager made a detailed introduction about the product, so that we have a comprehensive understanding of the product, and ultimately we decided to cooperate.
    5 Stars By Eleanore from Chile - 2017.11.20 15:58
    Write your message here and send it to us