Factory Supply Pipe And Tube Clamps - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

The corporation keeps to the operation concept "scientific management, superior quality and performance primacy, consumer supreme for Water Hose Coupling , Cast Iron Gas Pipe Fittings , Brass Camlock , We look forward to establish a long-term business relationship with your esteem co-operation.
Factory Supply Pipe And Tube Clamps - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

Good quality comes initial; company is foremost; small business is cooperation" is our business philosophy which is frequently observed and pursued by our business for Factory Supply Pipe And Tube Clamps - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Seychelles , Canberra , Guinea , we're now looking forward to even greater cooperation with overseas customers based on mutual benefits. We are going to work wholeheartedly to improve our products and services. We also promise to work jointly with business partners to elevate our cooperation to a higher level and share success together. Warmly welcome you to visit our factory sincerely.
  • After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
    5 Stars By Delia from Naples - 2017.09.30 16:36
    Timely delivery, strict implementation of the contract provisions of the goods, encountered special circumstances, but also actively cooperate, a trustworthy company!
    5 Stars By Mandy from Kenya - 2018.06.05 13:10
    Write your message here and send it to us