Factory Supply Pipe And Tube Clamps - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We strive for excellence, service the customers", hopes to become the best cooperation team and dominator enterprise for personnel, suppliers and customers, realizes value share and continuous promotion for Brass Camlock Coupling , Air Conditioning Pipe Fittings , Quick Connect Air Hose Fittings , Excellent quality, competitive prices, prompt delivery and dependable service are guaranteed Kindly let us know your quantity requirement under each size category so that we can inform you accordingly.
Factory Supply Pipe And Tube Clamps - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

With our loaded encounter and considerate services, we have now been recognized as a trustworthy supplier for lots of worldwide consumers for Factory Supply Pipe And Tube Clamps - Fast Coupling – Donghuan , The product will supply to all over the world, such as: US , Sheffield , Wellington , Now, we professionally supplies customers with our main products And our business is not only the "buy" and "sell", but also focus on more. We target to be your loyal supplier and long-term cooperator in China. Now, We hope to be the friends with you.
  • This manufacturer can keep improving and perfecting products and service, it is in line with the rules of market competition, a competitive company.
    5 Stars By Claire from Swansea - 2017.08.28 16:02
    We have been cooperated with this company for many years, the company always ensure timely delivery ,good quality and correct number, we are good partners.
    5 Stars By Marco from Belgium - 2018.09.16 11:31
    Write your message here and send it to us