Factory Supply Pipe And Tube Clamps - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We have probably the most state-of-the-art output equipment, experienced and qualified engineers and workers, recognized good quality manage systems plus a friendly skilled income workforce pre/after-sales support for Bathroom Water Pipe Fitting , Chicago Coupling , Aluminium Camlock Coupling , Only for accomplish the good-quality product or service to satisfy customer's demand, all of our products have been strictly inspected before shipment.
Factory Supply Pipe And Tube Clamps - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures

Factory Supply Pipe And Tube Clamps -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

As for competitive prices, we believe that you will be searching far and wide for anything that can beat us. We can state with absolute certainty that for such quality at such prices we are the lowest around for Factory Supply Pipe And Tube Clamps - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Birmingham , Cambodia , Istanbul , In order to meet the increasing requirement of customers both home and aboard, we will keep carrying forward the enterprise spirit of "Quality, Creativity, Efficiency and Credit" and strive to top the current trend and lead fashion. We warmly welcome you to visit our company and make cooperation.
  • This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.
    5 Stars By Maureen from Serbia - 2017.03.28 16:34
    The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Christine from America - 2017.05.21 12:31
    Write your message here and send it to us