Fast delivery British Standard Pipe Fittings - Meter Suivel Offsets – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Innovation, excellent and reliability are the core values of our company. These principles today much more than ever form the basis of our success as an internationally active mid-size business for Aluminium Camlock Coupling , Sanitary Pipes And Fittings , Pipe Patch Clamp , We respect your enquiry and it truly is our honor to operate with each friend around the world.
Fast delivery British Standard Pipe Fittings - Meter Suivel Offsets – Donghuan Detail:

Details

Gas meter connection is used to transport natural and propane gas in residential applications, gas meter connectors including GALVANIZED METER UNION, gas meter swivels, swivel nuts, insulated unions ,BSCA20, Offset insulated etc. We understand the critical nature of meter connections and we recognize the need for safe and reliable connections that can be used in a variety of meter connection application. We also can produced according to customer’s requirement, if you have your special requirement, welcome contact with us. Sample or drawing both are ok for us to open the new mould for you.



1.Material: Malleable iron

2.Size Available: 3/4’’—2’’

3.Surface :  Hot dip galvanized

Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.

The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01

4.Application  Suitable for fire piping system,air,gas,oil and so on.

5.Treatment: By CNC machine.

6.Methods to avoid the problem:

① Pay attention to the placement during annealing

② Casting surface: no trachoma, pores and other phenomena

③ Galvanized surface needs to be bright, no leaked and black oil stain

④ Thread requirement: Thread meets the requirement of ring gauge or plug gauge, strengthen the inspection of the machining part and adopt numerical control machining.

⑤ 100% Pressure

⑥ Packing requirements : keep the carton clean and tidy, label paste correctly

7. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

8. Packing detail: Packed in cartons then on pallets;

9. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

10. Quantity tolerance: 15% .


Product detail pictures:

Fast delivery British Standard Pipe Fittings -
 Meter Suivel Offsets – Donghuan detail pictures

Fast delivery British Standard Pipe Fittings -
 Meter Suivel Offsets – Donghuan detail pictures

Fast delivery British Standard Pipe Fittings -
 Meter Suivel Offsets – Donghuan detail pictures

Fast delivery British Standard Pipe Fittings -
 Meter Suivel Offsets – Donghuan detail pictures


Related Product Guide:

Like a result of ours specialty and repair consciousness, our enterprise has won a superb popularity amid buyers everywhere in the environment for Fast delivery British Standard Pipe Fittings - Meter Suivel Offsets – Donghuan , The product will supply to all over the world, such as: Vietnam , Yemen , Argentina , As a well educated, innovative and energetic staff,we are responsible for all elements of the research, design, manufacturing, sales and distribution. With studying and developing new techniques,we are not only following but also leading the fashion industry. We listen attentively to the feedback from our customers and provide instant communication. You will instantly feel our expertise and attentive service.
  • The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Renee from Burundi - 2017.09.09 10:18
    After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
    5 Stars By Miguel from St. Petersburg - 2017.09.26 12:12
    Write your message here and send it to us