Hot Selling for Dci Pipes And Fittings - Double Bolt Clamps – Donghuan
Hot Selling for Dci Pipes And Fittings - Double Bolt Clamps – Donghuan Detail:
Details
1. Inner surface has dual gripping ridges
2. Bolts lugs are reinforced to prevent bending out of alignment
3. Measure hose OD accurately before ordering clamps
4. Torque values for clamps are based on dry bolts. The use of lubricant on bolts will adversely affect clamp performance
Double Bolt clamps size list as below:
Name | code | size | rang size | Note | Colour |
double bolt clamp | DB | SL-22 | 20-22mm | Without saddles | Yellow |
double bolt clamp | DB | SL-29 | 22-29mm | ||
double bolt clamp | DB | SL-34 | 29-34mm | ||
double bolt clamp | DB | SL-40 | 34-40mm | ||
double bolt clamp | DB | SL-49 | 40-49mm | ||
double bolt clamp | DB | SL-60 | 49-60mm | Carbon steel saddles | |
double bolt clamp | DB | SL-76 | 60-76mm | ||
double bolt clamp | DB | SL-94 | 76-94mm | ||
double bolt clamp | DB | SL-115 | 94-115mm | ||
double bolt clamp | DB | SL-400 | 90-100mm | ||
double bolt clamp | DB | SL-525 | 100-125mm | Malleable iron saddles | White |
double bolt clamp | DB | SL-550 | 125-150mm | ||
double bolt clamp | DB | SL-675 | 150-175mm | ||
double bolt clamp | DB | SL-769 | 175-200mm | ||
double bolt clamp | DB | SL-818 | 200-225mm | ||
double bolt clamp | DB | SL-988 | 225-250mm | ||
double bolt clamp | DB | SL-1125 | 250-300mm | ||
double bolt clamp | DB | SL-1275 | 300-350mm |
6.instruction for double bolt clamps Firstly, check the pipe end surface and assure that the pipe is smooth, then aligning two piece of clamps and insert the bolt and connect them, finally hand tighten nuts make sure oval next bolt completely fits into bolt hole. Please make sure you use a wrench.
7.MILL TEST REPORT
Description: Double bolt clamps
Description |
Chemical Properties |
Physical Properties |
|||||
Lot No. |
C |
Si |
Mn |
P |
S |
Tensile Strength |
Elongation |
ALL PALLET |
2.76 |
1.65 |
0.55 |
LESS THAN 0.07 |
LESS THAN 0.15 |
300 Mpa |
6% |
8. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;
9. Packing detail: Packed in cartons then on pallets;
10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;
11. Quantity tolerance: 15% .
Product detail pictures:





Related Product Guide:
While using the "Client-Oriented" organization philosophy, a rigorous top quality command process, highly developed production devices and a potent R&D workforce, we normally provide high quality products, outstanding solutions and aggressive charges for Hot Selling for Dci Pipes And Fittings - Double Bolt Clamps – Donghuan , The product will supply to all over the world, such as: Qatar , Johor , Singapore , The president and all the company members would like to provide qualified goods and services for customers and sincerely welcome and cooperate with all native and foreign customers for a bright future.

Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
