New Delivery for Pipe Floor Clamp - Steam Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

All we do is usually connected with our tenet " Customer to start with, Rely on initial, devoting on the food packaging and environmental protection for High Pressure Air Hose Clamps , Quick Fit Pipe Clamps , Sliding Pipe Clamp , We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
New Delivery for Pipe Floor Clamp - Steam Coupling – Donghuan Detail:

Details

Ground joint complete seal hose fitting is made of plated iron and connects a high-pressure air and steam hose to a male NPT threaded connection. It has a barbed end to create a tight seal on a hose when used with a hose clamp or crimp sleeve or ferrule (not included) and a female National Pipe Taper (NPT) threads on the other to connect to male NPT threaded connections. This fitting is made of plated iron for strength, malleability, ductility, and resistance to corrosion, and it has a polymer seat for chemical resistance. This Boss ground joint complete seal hose fitting is recommended for steam service up to 450 degrees F.






1.A ground joint female hose coupling set includes hose stem, female NPT spud, and hammer swivel. The seal on the nose of the spud creates a tight seal when the hammer swivel pulls it against the hose stem.
2.Material: Malleable iron
3.Maximum Working Temperature:450 °F
4.Size Available: 1/2’’—3’’
5.Application: Female spud only couplings supply a convenient threaded fitting to connect two lengths of hose, or a single length to a male or female threaded outlet. Use with Ground Joint fittings. They are all-purpose hose couplings, universally recommended for steam hose connections. They are also widely used for air, water, fluid petroleum, chemicals etc.
6.Parts: Zinc Plated Iron Wing Nut, Female NPT,BSP Spud, Hose stem
7.Style: Hose Stem with Wing Nut and Female Spud Ground Joint
8.Surface :  Zinc Plated
9.Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;
10. Packing detail: Packed in cartons then on pallets;
11. Delivery date: 60days after receiving 30% prepayments and also confirming samples;
12. Quantity tolerance: 15% .


Product detail pictures:

New Delivery for Pipe Floor Clamp -
 Steam Coupling – Donghuan detail pictures

New Delivery for Pipe Floor Clamp -
 Steam Coupling – Donghuan detail pictures

New Delivery for Pipe Floor Clamp -
 Steam Coupling – Donghuan detail pictures

New Delivery for Pipe Floor Clamp -
 Steam Coupling – Donghuan detail pictures

New Delivery for Pipe Floor Clamp -
 Steam Coupling – Donghuan detail pictures

New Delivery for Pipe Floor Clamp -
 Steam Coupling – Donghuan detail pictures

New Delivery for Pipe Floor Clamp -
 Steam Coupling – Donghuan detail pictures


Related Product Guide:

"Sincerity, Innovation, Rigorousness, and Efficiency" may be the persistent conception of our organization for that long-term to establish jointly with customers for mutual reciprocity and mutual gain for New Delivery for Pipe Floor Clamp - Steam Coupling – Donghuan , The product will supply to all over the world, such as: Philadelphia , South Korea , Sevilla , We have 48 provincial agencies in the country. We also have stable cooperation with several international trading companies. They place order with us and export products to other countries. We expect to cooperate with you to develop a larger market.
  • High production efficiency and good product quality, fast delivery and completed after-sale protection, a right choice, a best choice.
    5 Stars By Marina from Amsterdam - 2018.05.15 10:52
    We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Karen from Poland - 2017.12.02 14:11
    Write your message here and send it to us