Newly Arrival Gas Pipe Clamp Cost - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

It is actually our accountability to satisfy your needs and effectively serve you. Your pleasure is our best reward. We're on the lookout forward for your stop by for joint growth for Ductile Iron Pipe Fittings , Agriculture Pipes And Fittings , Gas Pipe Clamp , We sincerely welcome friends from all over the world to cooperate with us on the basis of long-term mutual benefits.
Newly Arrival Gas Pipe Clamp Cost - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Newly Arrival Gas Pipe Clamp Cost -
 Fast Coupling – Donghuan detail pictures

Newly Arrival Gas Pipe Clamp Cost -
 Fast Coupling – Donghuan detail pictures

Newly Arrival Gas Pipe Clamp Cost -
 Fast Coupling – Donghuan detail pictures

Newly Arrival Gas Pipe Clamp Cost -
 Fast Coupling – Donghuan detail pictures

Newly Arrival Gas Pipe Clamp Cost -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We strive for excellence, service the customers", hopes to become the best cooperation team and dominator enterprise for personnel, suppliers and customers, realizes value share and continuous promotion for Newly Arrival Gas Pipe Clamp Cost - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Tunisia , Mexico , Montreal , We've got won a good reputation among overseas and domestic clients. Adhering to the management tenet of "credit oriented, customer first, high efficiency and mature services", we warmly welcome friends from all walks of life to cooperate with us.
  • The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
    5 Stars By Josephine from Manchester - 2017.06.25 12:48
    The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
    5 Stars By mary rash from The Swiss - 2018.06.26 19:27
    Write your message here and send it to us