Newly Arrival Gas Pipe Clamp Cost - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our commission should be to provide our customers and consumers with ideal top quality and aggressive portable digital products for Tube And Clamp , Quick Release Tube Clamp , Brass Camlock , Any interest, please feel free to contact us. We are looking forward to forming successful business relationships with new clients around the world in the near future.
Newly Arrival Gas Pipe Clamp Cost - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Newly Arrival Gas Pipe Clamp Cost -
 Fast Coupling – Donghuan detail pictures

Newly Arrival Gas Pipe Clamp Cost -
 Fast Coupling – Donghuan detail pictures

Newly Arrival Gas Pipe Clamp Cost -
 Fast Coupling – Donghuan detail pictures

Newly Arrival Gas Pipe Clamp Cost -
 Fast Coupling – Donghuan detail pictures

Newly Arrival Gas Pipe Clamp Cost -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We're convinced that with joint endeavours, the business between us will bring us mutual benefits. We are able to guarantee you products high quality and competitive value for Newly Arrival Gas Pipe Clamp Cost - Fast Coupling – Donghuan , The product will supply to all over the world, such as: United States , Turin , Turkey , As the world economic integration bringing challenges and opportunities to the xxx industry, our company , by carrying on our teamwork, quality first, innovation and mutual benefit, are confident enough to provide our clients sincerely with qualified products, competitive price and great service, and to build a brighter future under the spirit of higher, faster, stronger with our friends together by carrying on our discipline.
  • This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Andy from Albania - 2018.09.08 17:09
    Although we are a small company, we are also respected. Reliable quality, sincere service and good credit, we are honored to be able to work with you!
    5 Stars By Hilary from Bangladesh - 2017.05.02 18:28
    Write your message here and send it to us