professional factory for Drain Pipe Clamp - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our crew through skilled training. Skilled skilled knowledge, strong sense of company, to meet the company wants of customers for Tube Clamp Fittings , Black Cast Iron Pipe Fittings , Universal Pipe Clamp , The main goal of our company is to live a satisfactory memory to all the customers, and establish a long term business relationship with buyers and users all over the world.
professional factory for Drain Pipe Clamp - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

professional factory for Drain Pipe Clamp -
 Fast Coupling – Donghuan detail pictures

professional factory for Drain Pipe Clamp -
 Fast Coupling – Donghuan detail pictures

professional factory for Drain Pipe Clamp -
 Fast Coupling – Donghuan detail pictures

professional factory for Drain Pipe Clamp -
 Fast Coupling – Donghuan detail pictures

professional factory for Drain Pipe Clamp -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We now have our own gross sales team, style and design workforce, technical crew, QC workforce and package group. We now have strict quality manage procedures for each system. Also, all of our workers are experienced in printing industry for professional factory for Drain Pipe Clamp - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Kuwait , Buenos Aires , Bahrain , We've got a dedicated and aggressive sales team, and many branches, catering to our customers. We are looking for long-term business partnerships, and ensure our suppliers that they will absolutely benefit in both short and long run.
  • As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Fiona from Ukraine - 2018.11.02 11:11
    It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
    5 Stars By Ellen from Morocco - 2018.05.13 17:00
    Write your message here and send it to us