Short Lead Time for Cast Iron Plumbing Fittings - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our growth depends on the superior equipment ,exceptional talents and continuously strengthened technology forces for Brass Pipe Fittings , Stainless Steel Camlock Fittings , Air Hose Connectors , We put honest and health as the primary responsibility. We have a professional international trade team which graduated from America. We are your next business partner.
Short Lead Time for Cast Iron Plumbing Fittings - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We always believe that one's character decides products' quality, the details decides products' quality ,with the REALISTIC,EFFICIENT AND INNOVATIVE team spirit for Short Lead Time for Cast Iron Plumbing Fittings - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Lebanon , Austria , Los Angeles , For more than ten years experience in this filed, our company has gained high reputation from home and abroad. So we welcome friends from all over the world to come and contact us, not only for business, but also for friendship.
  • This supplier's raw material quality is stable and reliable, has always been in accordance with the requirements of our company to provide the goods that quality meet our requirements.
    5 Stars By lucia from Manila - 2017.08.16 13:39
    As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Amy from Lisbon - 2018.10.31 10:02
    Write your message here and send it to us