Short Lead Time for Cast Iron Plumbing Fittings - Meter Suivel Offsets – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Pipe Fitting Floor Flanges , Malleable Iron Fittings, Bsp Pipe Fittings , We will continually strive to improve our service and provide the best quality products with competitive prices. Any inquiry or comment is highly appreciated. Please contact us freely.
Short Lead Time for Cast Iron Plumbing Fittings - Meter Suivel Offsets – Donghuan Detail:

Details

Gas meter connection is used to transport natural and propane gas in residential applications, gas meter connectors including GALVANIZED METER UNION, gas meter swivels, swivel nuts, insulated unions ,BSCA20, Offset insulated etc. We understand the critical nature of meter connections and we recognize the need for safe and reliable connections that can be used in a variety of meter connection application. We also can produced according to customer’s requirement, if you have your special requirement, welcome contact with us. Sample or drawing both are ok for us to open the new mould for you.



1.Material: Malleable iron

2.Size Available: 3/4’’—2’’

3.Surface :  Hot dip galvanized

Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.

The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01

4.Application  Suitable for fire piping system,air,gas,oil and so on.

5.Treatment: By CNC machine.

6.Methods to avoid the problem:

① Pay attention to the placement during annealing

② Casting surface: no trachoma, pores and other phenomena

③ Galvanized surface needs to be bright, no leaked and black oil stain

④ Thread requirement: Thread meets the requirement of ring gauge or plug gauge, strengthen the inspection of the machining part and adopt numerical control machining.

⑤ 100% Pressure

⑥ Packing requirements : keep the carton clean and tidy, label paste correctly

7. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

8. Packing detail: Packed in cartons then on pallets;

9. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

10. Quantity tolerance: 15% .


Product detail pictures:

Short Lead Time for Cast Iron Plumbing Fittings -
 Meter Suivel Offsets – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Meter Suivel Offsets – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Meter Suivel Offsets – Donghuan detail pictures

Short Lead Time for Cast Iron Plumbing Fittings -
 Meter Suivel Offsets – Donghuan detail pictures


Related Product Guide:

Trustworthy good quality and excellent credit score standing are our principles, which will help us at a top-ranking position. Adhering towards the tenet of "quality first, buyer supreme" for Short Lead Time for Cast Iron Plumbing Fittings - Meter Suivel Offsets – Donghuan , The product will supply to all over the world, such as: South Africa , Amsterdam , Toronto , We rely on high-quality materials, perfect design, excellent customer service and the competitive price to win the trust of many customers at home and abroad. 95%products are exported to overseas markets.
  • This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Paula from luzern - 2017.02.14 13:19
    Good quality, reasonable prices, rich variety and perfect after-sales service, it's nice!
    5 Stars By Josephine from Hyderabad - 2018.09.29 13:24
    Write your message here and send it to us