Short Lead Time for Clamp Hanger For Pipe - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With our leading technology also as our spirit of innovation,mutual cooperation, benefits and advancement, we'll build a prosperous future together with your esteemed organization for Pressure Hose Coupling , Metal Gas Pipe Fittings , Tube Connector Clamps , We welcome new and outdated clients from all walks of daily life to get hold of us for long term organization associations and achieving mutual results!
Short Lead Time for Clamp Hanger For Pipe - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Short Lead Time for Clamp Hanger For Pipe -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Clamp Hanger For Pipe -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Clamp Hanger For Pipe -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Clamp Hanger For Pipe -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Clamp Hanger For Pipe -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

Often customer-oriented, and it's our ultimate target to become not only probably the most reputable, trustable and honest provider, but also the partner for our customers for Short Lead Time for Clamp Hanger For Pipe - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Vietnam , United Arab Emirates , Switzerland , Our monthly output is more than 5000pcs. We have set up a strict quality control system. Please feel free to contact us for further information. We hope that we can establish long-term business relationships with you and carry out business on a mutually beneficial basis. We are and will be always trying our best to serve you.
  • This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Vanessa from Mauritius - 2017.08.21 14:13
    Timely delivery, strict implementation of the contract provisions of the goods, encountered special circumstances, but also actively cooperate, a trustworthy company!
    5 Stars By Anne from Philippines - 2018.06.30 17:29
    Write your message here and send it to us