Short Lead Time for Clamp Hanger For Pipe - Valve – Donghuan
Short Lead Time for Clamp Hanger For Pipe - Valve – Donghuan Detail:
Details
| Norminal Diameter | DN15-DN50, can be customized |
| Norminal Pressure | 1.6Mpa |
| Working Medium | Water, Non-causticity liquid, Saturated steam |
| Working Temperature | -10°C≤T≤110°C |
1.Material: Malleable iron/ brass
2.Fields of applications :Water & Gas
3.Threads: ISO7/1
4.Nominal Pressure: 1.6MPa
5.Test Pressure: 2.4 MPa
6.Suitable Temperature:<=200 °C
7.Used materials: valve body: malleable cast iron; head body, stem, disc, adjustable stem nut: brass; handwheel: cast iron; valve disc seal: rubber; adjustable stem nut seal: EPDM rubber; valve head seal: fibre
8.Suitable Medium: water, steam, oil
9.Size Available: 1/2’’—2’’
10.Surface : Body with Hot dip galvanized
11. Product specification
|
Pictures |
Size |
unite weight g |
Work parameters |
Packing | |
|
1/2 |
320 |
PN 10, 100°C |
A self-sealing bag with a label,then put one carton |
|
|
3/4 |
550 |
PN 10, 100°C |
|||
|
1/2 |
6 |
PN 10, 100°C |
||
|
3/4 |
8 |
PN 10, 100°C |
|||
![]() |
1/2 |
285 |
PN 10, 100°C |
||
|
3/4 |
450 |
PN 10, 100°C |
|||
|
1 |
645 |
PN 10, 100°C |
|||
|
1-1/4 |
1015 |
PN 10, 100°C |
|||
|
1-1/2 |
1607 |
PN 10, 100°C |
|||
|
2 |
2423 |
PN 10, 100°C |
11. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;
12. Packing detail: Packed in cartons then on pallets; or as each customer requirement.
13. Delivery date: 60days after receiving 30% prepayments and also confirming samples;
14. Quantity tolerance: 15% .



Comments
Handel Material: Brass
Fields of applications :Water & Gas
Working Temperature:-20℃,+120℃
Packaging :Standard export package or Customized
Payment: L/C,T/T,Western Union
Loading port:Tianjin Port
Product detail pictures:
Related Product Guide:
The pretty loaded projects management experiences and one to a person support model make the high importance of business enterprise communication and our easy understanding of your expectations for Short Lead Time for Clamp Hanger For Pipe - Valve – Donghuan , The product will supply to all over the world, such as: Namibia , Irish , Algeria , We have a strict and complete quality control system, which ensures that each product can meet quality requirements of customers. Besides, all of our products have been strictly inspected before shipment.
This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!






