Short Lead Time for Clamp Hanger For Pipe - Valve – Donghuan
Short Lead Time for Clamp Hanger For Pipe - Valve – Donghuan Detail:
Details
| Norminal Diameter | DN15-DN50, can be customized |
| Norminal Pressure | 1.6Mpa |
| Working Medium | Water, Non-causticity liquid, Saturated steam |
| Working Temperature | -10°C≤T≤110°C |
1.Material: Malleable iron/ brass
2.Fields of applications :Water & Gas
3.Threads: ISO7/1
4.Nominal Pressure: 1.6MPa
5.Test Pressure: 2.4 MPa
6.Suitable Temperature:<=200 °C
7.Used materials: valve body: malleable cast iron; head body, stem, disc, adjustable stem nut: brass; handwheel: cast iron; valve disc seal: rubber; adjustable stem nut seal: EPDM rubber; valve head seal: fibre
8.Suitable Medium: water, steam, oil
9.Size Available: 1/2’’—2’’
10.Surface : Body with Hot dip galvanized
11. Product specification
|
Pictures |
Size |
unite weight g |
Work parameters |
Packing | |
|
1/2 |
320 |
PN 10, 100°C |
A self-sealing bag with a label,then put one carton |
|
|
3/4 |
550 |
PN 10, 100°C |
|||
|
1/2 |
6 |
PN 10, 100°C |
||
|
3/4 |
8 |
PN 10, 100°C |
|||
![]() |
1/2 |
285 |
PN 10, 100°C |
||
|
3/4 |
450 |
PN 10, 100°C |
|||
|
1 |
645 |
PN 10, 100°C |
|||
|
1-1/4 |
1015 |
PN 10, 100°C |
|||
|
1-1/2 |
1607 |
PN 10, 100°C |
|||
|
2 |
2423 |
PN 10, 100°C |
11. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;
12. Packing detail: Packed in cartons then on pallets; or as each customer requirement.
13. Delivery date: 60days after receiving 30% prepayments and also confirming samples;
14. Quantity tolerance: 15% .



Comments
Handel Material: Brass
Fields of applications :Water & Gas
Working Temperature:-20℃,+120℃
Packaging :Standard export package or Customized
Payment: L/C,T/T,Western Union
Loading port:Tianjin Port
Product detail pictures:
Related Product Guide:
Our team through qualified training. Skilled professional knowledge, powerful sense of support, to satisfy the support desires of consumers for Short Lead Time for Clamp Hanger For Pipe - Valve – Donghuan , The product will supply to all over the world, such as: Cambodia , New Orleans , Florence , Now we have a excellent team supplying specialist service, prompt reply, timely delivery, excellent quality and best price to our customers. Satisfaction and good credit to every customer is our priority. We have been sincerely looking forward to cooperate with customers all over the world. We believe we can satisfy with you. We also warmly welcome customers to visit our company and purchase our solutions.
On this website, product categories is clear and rich, I can find the product I want very quickly and easily, this is really very good!







