Short Lead Time for Clamp Hanger For Pipe - Valve – Donghuan
Short Lead Time for Clamp Hanger For Pipe - Valve – Donghuan Detail:
Details
| Norminal Diameter | DN15-DN50, can be customized |
| Norminal Pressure | 1.6Mpa |
| Working Medium | Water, Non-causticity liquid, Saturated steam |
| Working Temperature | -10°C≤T≤110°C |
1.Material: Malleable iron/ brass
2.Fields of applications :Water & Gas
3.Threads: ISO7/1
4.Nominal Pressure: 1.6MPa
5.Test Pressure: 2.4 MPa
6.Suitable Temperature:<=200 °C
7.Used materials: valve body: malleable cast iron; head body, stem, disc, adjustable stem nut: brass; handwheel: cast iron; valve disc seal: rubber; adjustable stem nut seal: EPDM rubber; valve head seal: fibre
8.Suitable Medium: water, steam, oil
9.Size Available: 1/2’’—2’’
10.Surface : Body with Hot dip galvanized
11. Product specification
|
Pictures |
Size |
unite weight g |
Work parameters |
Packing | |
|
1/2 |
320 |
PN 10, 100°C |
A self-sealing bag with a label,then put one carton |
|
|
3/4 |
550 |
PN 10, 100°C |
|||
|
1/2 |
6 |
PN 10, 100°C |
||
|
3/4 |
8 |
PN 10, 100°C |
|||
![]() |
1/2 |
285 |
PN 10, 100°C |
||
|
3/4 |
450 |
PN 10, 100°C |
|||
|
1 |
645 |
PN 10, 100°C |
|||
|
1-1/4 |
1015 |
PN 10, 100°C |
|||
|
1-1/2 |
1607 |
PN 10, 100°C |
|||
|
2 |
2423 |
PN 10, 100°C |
11. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;
12. Packing detail: Packed in cartons then on pallets; or as each customer requirement.
13. Delivery date: 60days after receiving 30% prepayments and also confirming samples;
14. Quantity tolerance: 15% .



Comments
Handel Material: Brass
Fields of applications :Water & Gas
Working Temperature:-20℃,+120℃
Packaging :Standard export package or Customized
Payment: L/C,T/T,Western Union
Loading port:Tianjin Port
Product detail pictures:
Related Product Guide:
We normally think and practice corresponding towards the change of circumstance, and grow up. We aim at the achievement of a richer mind and body plus the living for Short Lead Time for Clamp Hanger For Pipe - Valve – Donghuan , The product will supply to all over the world, such as: Toronto , Rotterdam , Canberra , Insisting over the high-quality generation line management and prospects guide provider, we have made our resolution to offer our shoppers using the initially stage purchasing and soon after provider working experience. Preserving the prevailing helpful relations with our prospects, we even now innovate our product lists the many time to meet up with the brand new wants and stick to the latest trend of this business in Ahmedabad. We're ready to facial area the difficulties and make the transform to grasp many of the possibilities in international trade.
The company keeps to the operation concept "scientific management, high quality and efficiency primacy, customer supreme", we have always maintained business cooperation. Work with you,we feel easy!








