Short Lead Time for Electrical Pipe Fittings - Meter Suivel Offsets – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We take pleasure in an exceptionally excellent status between our buyers for our superb merchandise good quality, aggressive price tag and the greatest support for Clamp For Pipe Fitting , Cast Iron Waste Pipe Fittings , Eletric Hose Clamps , We welcome you to definitely join us in this path of making a affluent and productive business together.
Short Lead Time for Electrical Pipe Fittings - Meter Suivel Offsets – Donghuan Detail:

Details

Gas meter connection is used to transport natural and propane gas in residential applications, gas meter connectors including GALVANIZED METER UNION, gas meter swivels, swivel nuts, insulated unions ,BSCA20, Offset insulated etc. We understand the critical nature of meter connections and we recognize the need for safe and reliable connections that can be used in a variety of meter connection application. We also can produced according to customer’s requirement, if you have your special requirement, welcome contact with us. Sample or drawing both are ok for us to open the new mould for you.



1.Material: Malleable iron

2.Size Available: 3/4’’—2’’

3.Surface :  Hot dip galvanized

Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.

The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01

4.Application  Suitable for fire piping system,air,gas,oil and so on.

5.Treatment: By CNC machine.

6.Methods to avoid the problem:

① Pay attention to the placement during annealing

② Casting surface: no trachoma, pores and other phenomena

③ Galvanized surface needs to be bright, no leaked and black oil stain

④ Thread requirement: Thread meets the requirement of ring gauge or plug gauge, strengthen the inspection of the machining part and adopt numerical control machining.

⑤ 100% Pressure

⑥ Packing requirements : keep the carton clean and tidy, label paste correctly

7. Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

8. Packing detail: Packed in cartons then on pallets;

9. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

10. Quantity tolerance: 15% .


Product detail pictures:

Short Lead Time for Electrical Pipe Fittings -
 Meter Suivel Offsets – Donghuan detail pictures

Short Lead Time for Electrical Pipe Fittings -
 Meter Suivel Offsets – Donghuan detail pictures

Short Lead Time for Electrical Pipe Fittings -
 Meter Suivel Offsets – Donghuan detail pictures

Short Lead Time for Electrical Pipe Fittings -
 Meter Suivel Offsets – Donghuan detail pictures


Related Product Guide:

Assume full accountability to satisfy all demands of our consumers; reach ongoing advancements by endorsing the expansion of our purchasers; come to be the final permanent cooperative partner of clients and maximize the interests of clientele for Short Lead Time for Electrical Pipe Fittings - Meter Suivel Offsets – Donghuan , The product will supply to all over the world, such as: Congo , Southampton , Saudi Arabia , Nowadays our products sell all over the domestic and abroad thanks for the regular and new customers support. We provide high quality product and competitive price, welcome the regular and new customers cooperate with us!
  • Factory equipment is advanced in the industry and the product is fine workmanship, moreover the price is very cheap, value for money!
    5 Stars By Astrid from Ethiopia - 2018.11.02 11:11
    We are long-term partners, there is no disappointment every time, we hope to maintain this friendship later!
    5 Stars By Sally from Gabon - 2018.12.05 13:53
    Write your message here and send it to us