Short Lead Time for Pipe Lock Clamp - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Quality first, Honesty as base, Sincere service and mutual profit" is our idea, in order to develop continuously and pursue the excellence for Brass Camlock , Steam Hose Coupling , Hose With Coupling , With a wide range, top quality, reasonable rates and stylish designs, our products are extensively used with this industries and other industries.
Short Lead Time for Pipe Lock Clamp - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Short Lead Time for Pipe Lock Clamp -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Pipe Lock Clamp -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Pipe Lock Clamp -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Pipe Lock Clamp -
 Fast Coupling – Donghuan detail pictures

Short Lead Time for Pipe Lock Clamp -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

To be able to give you benefit and enlarge our business, we also have inspectors in QC Team and assure you our greatest service and products for Short Lead Time for Pipe Lock Clamp - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Sudan , Toronto , Peru , Company name, is always regarding quality as company' s foundation, seeking for development via high degree of credibility , abiding by ISO quality management standard strictly, creating top-ranking company by spirit of progress-marking honesty and optimism.
  • Product variety is complete, good quality and inexpensive, the delivery is fast and transport is security, very good, we are happy to cooperate with a reputable company!
    5 Stars By Merry from Guinea - 2018.06.09 12:42
    As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Ada from Madras - 2017.11.12 12:31
    Write your message here and send it to us