Top Suppliers Water Pipe Clamp - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Quality comes first; service is foremost; business is cooperation" is our business philosophy which is constantly observed and pursued by our company for Plumbing Pipe Fittings , Camlock Coupling Types , Tube Holding Clamps , Items won certifications with the regional and international primary authorities. For far more detailed information, please contact us!
Top Suppliers Water Pipe Clamp - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Top Suppliers Water Pipe Clamp -
 Fast Coupling – Donghuan detail pictures

Top Suppliers Water Pipe Clamp -
 Fast Coupling – Donghuan detail pictures

Top Suppliers Water Pipe Clamp -
 Fast Coupling – Donghuan detail pictures

Top Suppliers Water Pipe Clamp -
 Fast Coupling – Donghuan detail pictures

Top Suppliers Water Pipe Clamp -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

High quality Very first,and Consumer Supreme is our guideline to offer the most beneficial service to our consumers.At present, we're attempting our greatest to be among the top exporters in our area to fulfill buyers far more need to have for Top Suppliers Water Pipe Clamp - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Luxembourg , Malta , Barbados , we rely on own advantages to build a mutual-benefit commerce mechanism with our cooperative partners. As a result, we have gained a global sales network reaching the Middle East, Turkey, Malaysia and Vietnamese.
  • It's really lucky to find such a professional and responsible manufacturer, the product quality is good and delivery is timely, very nice.
    5 Stars By Laura from Serbia - 2018.09.29 17:23
    As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Madeline from Venezuela - 2017.09.16 13:44
    Write your message here and send it to us