Wholesale Price Copper Pipe Leak Clamp - Fast Coupling – Donghuan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our advantages are lower prices,dynamic sales team,specialized QC,strong factories,high quality products and services for Pipe Line Fittings , Black Iron Gas Fitting , Pipe Joiner Clamp , We sincerely look forward to hearing from you. Give us a chance to show you our professionalism and passion. We are sincerely welcome good friends from numerous circles at dwelling and abroad come to cooperate!
Wholesale Price Copper Pipe Leak Clamp - Fast Coupling – Donghuan Detail:

Details

1.Fast couplings which we mainly produced are departed the socked, nut, and clamps etc. All the standard specifies are produced according to the drawing design. Generally speaking, all dimensions are accurate, because it is very important to assemble. For all the socket before shipped we all make 100% air pressure testing. The surface are hot dip galvanized and black, we also export the rough product.

2.Fast fittings are used for connecting steel, PE and other pipes.

3.Material: Malleable iron

4.Size Available: 1/2’’–2’’

5.Advantage: we have our own design terms, any problem on the mould we can improve and revised. For example, the product problem are some have holes on the surface, we make a little on the mould to be sure the molten iron can go smoothly. some when casting the rate of finished products is lower, so we revised the method of casting.

6.Surface :  Hot dip galvanized or black. Hot dip zinc coating: where a protection by zinc coating is required, the zinc coating shall be applied by the hot dip process and shall meet the following requirements.





The content for testing:

Testing Items:

Testing Results: %

Pb <1.6 in individual cases 1.8
Al <0.1
Sb <0.01
As <0.02
Bi <0.01
Cd <0.01
Cu <0.1
Sn <0.1

7.Maximum operating temperature: 80°C

8.After-sales service: If the customer find the problem product, such as, leak, breakage, big burr, after check all we can ship the same qty free to customer.

Terms payments: TT 30% prepayments of products before producing and TT the balance after receiving copy of B/L, all price expressed in USD;

9. Packing detail: Packed in cartons then on pallets;

10. Delivery date: 60days after receiving 30% prepayments and also confirming samples;

11. Quantity tolerance: 15% .


Product detail pictures:

Wholesale Price Copper Pipe Leak Clamp -
 Fast Coupling – Donghuan detail pictures

Wholesale Price Copper Pipe Leak Clamp -
 Fast Coupling – Donghuan detail pictures

Wholesale Price Copper Pipe Leak Clamp -
 Fast Coupling – Donghuan detail pictures

Wholesale Price Copper Pipe Leak Clamp -
 Fast Coupling – Donghuan detail pictures

Wholesale Price Copper Pipe Leak Clamp -
 Fast Coupling – Donghuan detail pictures


Related Product Guide:

We goal to understand excellent disfigurement from the manufacturing and supply the top support to domestic and abroad clients wholeheartedly for Wholesale Price Copper Pipe Leak Clamp - Fast Coupling – Donghuan , The product will supply to all over the world, such as: Czech Republic , Peru , Mauritius , Being guided by customer demands, aiming at improving the efficiency and quality of customer service, we constantly improve goods and give more detailed services. We sincerely welcome friends to negotiate business and start cooperation with us. We hope to join hands with friends in different industries to create a brilliant future.
  • This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
    5 Stars By Kevin Ellyson from Madrid - 2017.09.16 13:44
    We feel easy to cooperate with this company, the supplier is very responsible, thanks.There will be more in-depth cooperation.
    5 Stars By Kama from Mauritius - 2018.07.27 12:26
    Write your message here and send it to us